Buying
Guidelines of Automation
by: Michael Katz / owner Dial-X
Automated Equipment, Inc.
|
|
1. Consult with a reputable automation
vendor with the capabilities of taking full responsibility for designing
and building automation equipment, building vibratory feeder bowls,
designing and building controls for the automation
equipment, and the electrical and pneumatics. A single source
vendor will result in less expensive equipment for you with more
productive automation resulting in fewer service calls. If,
however, a service is required, the vendor should be capable of handling
most problems.
2. In selecting, a vendor for your automation, you should contact
previous customers of the vendor and ask about the quality of the
equipment, the service provided, and the training of their personnel,
prior to sending a request for a quotation to the vendor.
3. Select approximately three reputable automation vendor's when
requesting a quotation for your automation project. Send parts
(assembly components and unassembled components) and ask for budgetary
pricing. This will save both yourself and the vendor time in
determining if the project is viable.
4. If at all possible, you should visit the vendor's facility to
review the equipment on their floor being built at that time.
Acquire a list of previous customers of the vendor's in your area. If
possible visit them to review the equipment that has been built by the
vendor.
5. Request a Certificate of Insurance from the vendor.
6. If the project is viable and you have received budgetary
pricing from the vendor, you should request that the vendor visit your
facility to review the project further. This meeting should
include the vendor, two individuals in management, two individuals in maintenance,
and two individuals from the assembly department. It is essential
to have the input of all departments to assure a successful project.
7. Supply the vendor with the following:
* Assembled
components; as system will produce.
* Specifications
of any equipment your company prefers. Keep this short but complete. Be sure to include the color you
request the system to be painted or any other specific options required
by your company.
* Two sets of
updated prints of components; making notes on print if any of the parts
are not to print or contain flash/burrs or any other imperfections.
* If molded
parts, samples from each cavity are required.
Provide
information that your Quality Control Department would be looking for
during assembly at your facility.
8. Management, Maintenance and Production personnel should
discuss the project to its entirety prior to issuing a purchase order
for the project.
9. Schedule a chain-of-command, agreeable with your company and
vendor. There should be only one person from each company communicating
with one another. A second person, however, may be required for
back-up.
10. At the time a purchase order is issued, inform your
Management, Production and Maintenance departments of the vendor
selected for the project.
11. At the time vendor requests your presence to review design
upon its completion, a representative from your Maintenance and
Production departments should be present, as well as your Engineering
Department.
12. Run-off of the equipment at the vendor's facility should
include a representative from your Maintenance, Engineering, and
Production departments. Any production parts ran at this time
should be given directly to your Quality Control Department for their
inspection.
13. Delivery of the equipment should be made by a reputable
machinery rigger and should be shipped from the vendor's facility
directly to the customer's facility. Equipment should be moved on an
air-ride tractor and trailer only.
14. When equipment is wired and large enough, an airline is ran
to the system; vendor should be notified of this. You should have parts
on hand; same as vendor had on their floor for run-off of the system.
Any/all personnel that were involved with the approval of the design and
run-off at vendor's facility should be involved, as well as one person
from your Production department from each shift running the system.
15. It is likely that immediately following training by the
vendor at your facility of the equipment, you will have some minor
problems. You should document any/all problems incurred over the
first two week period of production and describe them in detail.
Approximately two weeks into running the system, contact vendor and
request vendor to come to your facility to discuss all problems
documented. A copy should be sent to them for their review prior
to the visit. Major problems, however, should be dealt with
immediately.
|